Sundström had overall responsibility for the construction of two hazardous waste disposal sites for Vestia.

DSC03758

During 2020–24, two new hazardous waste disposal sites were built for the waste management company Vestia in Ylivieska. The total area of the sites is about 50 hectares.

First, the old soil was removed from the sites and rock was excavated. After this, a sealing layer was built out of clay. Finally, a plastic film was installed on top of the clay layer. This effectively prevents harmful substances from entering the soil. Earthfill embankments were also built around the disposal sites.

“Our cooperation with Sundström was smooth – the low hierarchy on the construction site and the ease of reaching agreements surprised us positively. Sundström excellently tackled the challenges posed by the project’s tight schedule. In this kind of weather-dependent land construction project, Sundström’s clear strength is the good availability of equipment.”

– Jarkko Saarinen, Construction Developer, Vestia

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.