All Sundström units involved in the company’s largest project

The construction of the roundwood loading site in Seinäjoki was Sundström’s most extensive project to date. All of the company’s units joined forces in the construction.

default

35-hectare work site

In 2023, a roundwood loading site was completed in Seinäjoki. The construction site covered a 35-hectare area in total. The expertise of all Sundsrtöm’s units was utilized in this project commissioned by the Finnish Transport Infrastructure Agency. Sundström was responsible for the implementation of the entire project.

On an area that was almost entirely covered by forest, the following was constructed:

  • A 17-hectare roundwood loading site
  • 2.5 kilometers of new, partially asphalted road and an underpass bridge
  • Over 7 kilometers of railway track with sub- and superstructure. The electrification of the track was handled by Sundström’s subsidiary, Rautatieto.

Crushed rock put to good use

Before the land construction, half of the roundwood loading site was covered by rock up to 15 meters high. 300,000 m³ of rock was excavated and crushed on-site. The crushed rock was utilized in the roundwood loading site.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.